Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
金沙赌场
金沙赌场
奥吉通
九正家居网
Casinos-in-Macau-contactus@vrwebtasarim.net
澳门皇冠赌场
海外网娱乐频道
硅湖职业技术学院
太阳城娱乐
Grand-Lisboa-admin@fibromyalgiaconnect.com
天博
无极在线
襄阳赶集网
多玩我的世界盒子官方网站
应届生求职网招聘会专区
OFweek机器人网
临房网
巴士坦克世界
莱州房产网